Legal Notice | Contact | Press | Approach | Sitemap | +Bookmark

Cycle-Construction against blue stain 50.00 m length


Top view
  • Top view
    (Click for Zoom)

Dipping-tank lifts up; in front of the dipping-tank: supplying of the packages; tilting for fast draining
  • Dipping-tank lifts up; in front of the dipping-tank: supplying of the packages; tilting for fast draining
    (Click for Zoom)

Delivery from wheels-line to cross-carrier
  • Delivery from wheels-line to cross-carrier
    (Click for Zoom)

Entry dipping-tank
  • Entry dipping-tank
    (Click for Zoom)

Bringing in the woodpackages into the dipping-tank
  • Bringing in the woodpackages into the dipping-tank
    (Click for Zoom)

Woodpackages are dipped into liquid; tilting of woodpackages
  • Woodpackages are dipped into liquid; tilting of woodpackages
    (Click for Zoom)

Fully dipped woodpackages; up- and downliftig in incline-position
  • Fully dipped woodpackages; up- and downliftig in incline-position
    (Click for Zoom)

Dipped woodpackages while lifting out of liquid
  • Dipped woodpackages while lifting out of liquid
    (Click for Zoom)

Top view with tilting
  • Top view with tilting
    (Click for Zoom)

Exit dipping-tank
  • Exit dipping-tank
    (Click for Zoom)

Removal over remote-control
  • Removal over remote-control
    (Click for Zoom)